CHESAPEAKE BOAT WORKS - BACK IN THE WATER

AUGUST 25, 2012

Today is the day.  After much hard work & sweat on Rod's part, the Chesapeake Boat Works lift is putting us back into the water.
Thanks to Kari Smallwood for the pictures.


Rod surveying his work




The bottom paint is more than 6 inches above the original.  Should take care of some of the growth we have been trying to keep under control.

With storms gathering Its Perfect is loaded
onto the lift

No comments:

Post a Comment